Building under construction shown from a point cloud, with the outline drawn on it

Engineering surveying

For sites and infrastructure

From the first axis to final inspection

Every building starts with a precise survey control network and ends with an as-built check. We give contractors and investors full survey support through every construction phase: from establishing the site traverse, through setting out axes and checking verticality, to monitoring settlement and deformation of finished structures.

We are currently running two active construction sites, one building next to the other, so this is our everyday work, not theory.

Request a quote
  • 2 active siteswe are currently surveying two buildings, side by side
  • Every phasefrom control network to as-built survey
  • Reportsand survey documents for final inspection
What we deliver

Survey support through the whole build

  • Design base plan – KTP

    Precise measurements to start the project.

  • Setting out

    Buildings, axes, foundations, columns and installations.

  • Geometry control

    Verticality, flatness and levels during construction.

  • Settlement monitoring

    Periodic deformation measurements with reports.

  • As-built

    As-built surveys and calculation of executed quantities.

  • Infrastructure

    Roads, railways, bridges, canals and underground utilities.

Projects

From an active site

Active site

Two residential and commercial buildings, Temerin

On two buildings, side by side, we have followed construction from the very start, step by step. Each phase gets its own setting out and sketch, all tied to the same site control network.

  • Survey and demolition of existing buildings
  • Site control network
  • Setting out the excavation pit
  • Setting out the axes
  • Setting out columns and axes floor by floor
Visualisation of a residential and commercial building with a ground-floor unit
Building visualisation
Setting-out sketch of ground-floor columns and axes
Setting-out sketch of columns and axes
Process

How we work

  1. Design base plan

    We survey the KTP, the base plan for the building design.

  2. Control network

    We establish the site traverse.

  3. Setting out and control

    We set out and check by construction phase.

  4. Reports

    We prepare reports and documents for final inspection.

FAQ

Questions about site work

01Which construction phases can you help with?

All of them: from the design base plan (KTP) and control network, through setting out, through geometry control during construction, to as-built surveys and final inspection documents.

02What do you need to get started?

At the very start we survey the KTP, the base plan for the building design. If we join a project that is already under way, we need the design documents for the building.